Geoplin plinovodi – Reconstruction of M2 gas pipeline

Investor: Geoplin plinovodi d.o.o.
Name of the facility: Reconstruction of the M2 gas pipeline at the Rogatec-Rogaška Slatina section
Type of installation: Transmission gas pipeline

Project Description

Reconstruction of the M2 gas pipeline was executed at the Rogatec-
Rogaška Slatina section. Within the scope of the construction also
processing and upgrading of the MMRP Rogatec, and construction of the transmission
station in OČP Rogaska Slatina were performed.

Within the scope of constructing the gas pipeline, we were responsible for supplying all
material required for the construction of the gas reconstructing the MMRP
Rogatec and OČP Rogaška Slatina and coordination of
mechanical and assembly works with the construction work. After the completion of work, the company arranged gas discharging
and commissioning the executed gas pipeline. For all respective works,
a group of engineers and technicians was engaged who
ensured smooth workflow and quality work.

During the most intensive phase of works, over 80 installers and certificated welders trained for the respective works
were engaged at the gas pipeline site.

Data on the gas pipeline:

● length of the gas pipeline: 8,100m
● operating pressure: 70 bar
● dimension of gas pipe: 813 X 12.5mm
● pipes used: SAWL and SAWH as per SIST EN 10208-2,
factory protected with PE or PP insulation
● materials used: L485 MB